Skip to content
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Call Now
Call Now
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Technician measuring harmonics at a drive feeder

Harmonic Mitigation Design: The 5% Drive Check for Canada

Uncategorized / Admin

Measure harmonics first, compare results with IEEE 519 and Canadian limits, choose passive, active, or hybrid filters, then verify performance.

Harmonic Mitigation Design: The 5% Drive Check for Canada Read More »

Standby generator beside control cabinet

Generator Load Shedding in Canada: Why CSA C282:24 Is Not Enough

Uncategorized / Admin

See how Canadian designers prioritize circuits, stage generator loads, and plan testable systems around CSA C282:24 and IESO/LDC operating realities.

Generator Load Shedding in Canada: Why CSA C282:24 Is Not Enough Read More »

Document controller checking an issued construction drawing

One Current Revision: Construction Document Control for Teams

Uncategorized / Admin

Learn how construction teams apply ISO 19650 principles to control revisions, approvals, RFIs, and handover records with rules suited to each project.

One Current Revision: Construction Document Control for Teams Read More »

BACnet router joining Ethernet and MS/TP wiring

BACnet IP vs MS/TP: Avoid Canadian BAS RFQ and Security Gaps

Uncategorized / Admin

Compare BACnet IP and MS/TP for Canadian BAS projects, then apply practical routing, commissioning, RFQ, and BACnet/SC security checks to your design.

BACnet IP vs MS/TP: Avoid Canadian BAS RFQ and Security Gaps Read More »

Engineer checking conflicting construction drawings

Canada’s Construction RFI Process: MEP Checks Cut Repeat RFIs

Uncategorized / Admin

Learn how a disciplined construction RFI process, MEP checklists, and BIM coordination can reduce repeat requests and speed resolution for Canadian projects.

Canada’s Construction RFI Process: MEP Checks Cut Repeat RFIs Read More »

Switchboard and switchgear lineups side by side

Switchboard vs. Switchgear in Canada: 1,000 V Shapes the Spec

Uncategorized / Admin

Compare switchboards and switchgear for Canadian projects, from CSA voltage limits to protection, maintenance, and drawing checklists, with practical spec…

Switchboard vs. Switchgear in Canada: 1,000 V Shapes the Spec Read More »

Technician checking an outdoor heat pump in winter

Air Source vs Ground Source in Canada: Cold Weather Shifts Payback

Uncategorized / Admin

Compare air and ground source heat pumps for Canadian projects: cold weather, payback, site needs, and engineering deliverables before you commit.

Air Source vs Ground Source in Canada: Cold Weather Shifts Payback Read More »

VFD and soft starter in a motor-control cabinet

VFD vs Soft Starter in Canada: 8–10 Starts per Hour Test the Limits

Uncategorized / Admin

Compare VFDs and soft starters for Canadian motor projects: duty cycle, starting current, harmonics, OESC checks, and total cost of ownership.

VFD vs Soft Starter in Canada: 8–10 Starts per Hour Test the Limits Read More »

Chilled-water pumps and insulated headers

3 Priorities for Canadian Chilled Water Design: NECB, NRCan, CSA

Uncategorized / Admin

Three priorities for Canadian chilled water design: cut pump and chiller energy, meet NECB/NRCan checks, and deliver permit ready drawings.

3 Priorities for Canadian Chilled Water Design: NECB, NRCan, CSA Read More »

Solar carport over Canadian parking stalls

Avoid 10 kW Plan Review: Solar Carport Design for Canadian MEPs

Uncategorized / Admin

Permit ready solar carport design for Canadian MEP teams. Covers ESA 10 kW plan review, LDC interconnection, and permit deliverables.

Avoid 10 kW Plan Review: Solar Carport Design for Canadian MEPs Read More »

← Previous 1 … 4 5 6 … 15 Next →
FutureGen

FutureGen Consulting Inc. is a Canadian engineering consulting firm. We specialize in mechanical and electrical engineering design services in the residential and commercial industry.

Our Company

  • Who We Are
  • Services We Provide
  • What We Have Done
  • Contact Us

Our Services

  • Electrical Construction Cost Estimation
  • Fire Protection & Fire Alarm System Design Services
  • EV Charger Infrastructure Design
  • HVAC System Design Services
  • Construction Review
  • Emergency Power Desgin
  • Site Lighting Design Services
  • Solar Power Design
  • Plumbing Design
  • Fire and Life Safety Design
  • Power System Studies
  • Temporary Power Design
  • Power Distribution Services
  • Spinkler System Design

Contact Details

  • 6850 Millcreek Dr Unit 106, Mississauga, ON L5N 4J9
  • (905) 586-4114
  • info@futuregenconsulting.ca

Copyright © 2026 Futuregen

Powered by Futuregen