Skip to content
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Call Now
Call Now
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Copper and PEX pipes in home renovation

Avoid Costly Repipes: Copper vs PEX for Canadian Homes, 2 mg/L

Uncategorized / Admin

Engineer-backed, Canada-focused checks to choose copper or PEX for a repipe. Learn the 2 mg/L copper concern, CSA B137.5 marking, cost and installation…

Avoid Costly Repipes: Copper vs PEX for Canadian Homes, 2 mg/L Read More »

PVC and CPVC pipes in mechanical room

82°C Limit: Choose PVC or CPVC for Canadian Hot Water

Uncategorized / Admin

Canada code-backed guidance for homeowners and contractors on choosing PVC or CPVC. Use CPVC for hot potable lines, PVC for cold/DWV, and verify CSA and…

82°C Limit: Choose PVC or CPVC for Canadian Hot Water Read More »

Lithium and lead-acid batteries in storage room

Avoid Permit Delays in Canada: Lithium or Lead Acid Code Checklist

Uncategorized / Admin

Canada focused comparison of lithium LFP and lead acid batteries. Prioritizes usable energy, 10 year cost, and Canadian code requirements with an engineer…

Avoid Permit Delays in Canada: Lithium or Lead Acid Code Checklist Read More »

Elevator machine room with emergency power equipment

Two Hour Rule: Elevator Emergency Power for Canadian Building Owners

Uncategorized / Admin

Canadian building owners and facility managers: a code-first action plan to confirm two hour generator needs, sizing, sequencing, testing, and what to ask…

Two Hour Rule: Elevator Emergency Power for Canadian Building Owners Read More »

Technician commissioning HRV in renovation

Permit Ready HVAC for Ontario Renovations: HRV & Commissioning

Uncategorized / Admin

Get permit ready HVAC design for Ontario renovations: engineer stamped drawings, HRV/ERV specs, ESA coordination, and commissioning to cut permit delays.

Permit Ready HVAC for Ontario Renovations: HRV & Commissioning Read More »

Technician measuring bathroom exhaust airflow

Permit Ready Ontario Ventilation Rates: OBC 9.32, HRAI/CSA, Field Fixes

Uncategorized / Admin

Learn OBC 9.32 ventilation sizing, PVC/TVC calculations, HRAI/CSA best practices, and field fixes to produce permit ready ventilation packages for Ontario…

Permit Ready Ontario Ventilation Rates: OBC 9.32, HRAI/CSA, Field Fixes Read More »

Ontario commercial tenant fit-out under construction

Save Thousands: Tenant Fit Out Costs in Ontario, $202 vs $306/sf

Uncategorized / Admin

Ontario tenants get market benchmarks (Toronto $202.40 hard cost, $306.68 all‑in), TIA realities, ESA and permit steps, and MEP advice to avoid budget…

Save Thousands: Tenant Fit Out Costs in Ontario, $202 vs $306/sf Read More »

Technician verifying office diffuser airflow

Avoid Permit Delays in Canadian Office HVAC: Verify Part Load IAQ

Uncategorized / Admin

A Canada focused MEP playbook for office HVAC fit outs. Require minimum and part load outdoor air verification, early engineering, TAB, commissioning, and…

Avoid Permit Delays in Canadian Office HVAC: Verify Part Load IAQ Read More »

Plumbing vent stack beneath roof termination

Avoid Permit Delays: Ontario Plumbing Venting Rules (O. Reg. 163/24)

Uncategorized / Admin

Clear Ontario plumbing venting rules under O. Reg. 163/24 and Section 7.5, how to read Table 7.5.8.3, and a FutureGen permit ready checklist.

Avoid Permit Delays: Ontario Plumbing Venting Rules (O. Reg. 163/24) Read More »

Engineered fire pump room with protected equipment

Three Non-Negotiable Requirements for Ontario Fire Pump Rooms

Uncategorized / Admin

Engineer-backed guide to Ontario fire pump rooms: meet Reg. 901/78, avoid ESA plan-review delays, design for drainage and access, and keep weekly and…

Three Non-Negotiable Requirements for Ontario Fire Pump Rooms Read More »

← Previous 1 … 5 6 7 … 15 Next →
FutureGen

FutureGen Consulting Inc. is a Canadian engineering consulting firm. We specialize in mechanical and electrical engineering design services in the residential and commercial industry.

Our Company

  • Who We Are
  • Services We Provide
  • What We Have Done
  • Contact Us

Our Services

  • Electrical Construction Cost Estimation
  • Fire Protection & Fire Alarm System Design Services
  • EV Charger Infrastructure Design
  • HVAC System Design Services
  • Construction Review
  • Emergency Power Desgin
  • Site Lighting Design Services
  • Solar Power Design
  • Plumbing Design
  • Fire and Life Safety Design
  • Power System Studies
  • Temporary Power Design
  • Power Distribution Services
  • Spinkler System Design

Contact Details

  • 6850 Millcreek Dr Unit 106, Mississauga, ON L5N 4J9
  • (905) 586-4114
  • info@futuregenconsulting.ca

Copyright © 2026 Futuregen

Powered by Futuregen