Skip to content
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Call Now
Call Now
FutureGen Consulting Logo
  • Home
  • Services
    • Emergency Power Desgin
    • Electrical Construction Cost Estimation
    • Fire Protection & Fire Alarm System Design
    • Construction Review
    • EV Charger Infrastructure Design
    • HVAC System Design
    • Site Lighting Design
    • Solar Power Design
    • Power System Studies
    • Power Distribution Services
    • EV Charger Infrastructure Design
    • Fire and Life Safety
    • Plumbing Design
    • Temporary Power Design
    • Spinkler System Design
  • Projects
  • Blog
  • Testimonials
  • Contact Us
  • Book A Meeting
Commercial electrical panel with surge protection

Surge Protection for Canadian Buildings: 3 SPD Types Engineers Specify

Uncategorized / Admin

Practical, code-aligned surge protection for Canadian buildings: layered SPD strategy, inspector-ready documentation, and clear guidance on when to call…

Surge Protection for Canadian Buildings: 3 SPD Types Engineers Specify Read More »

Commercial building envelope under energy review

Permit Ready SB-10 Files for Ontario: NECB 2020 Essentials

Uncategorized / Admin

Pass SB-10 permit review in Ontario: use the current municipal form, submit a stamped ECB or NECB 2020 model, and ensure schedules match the model.

Permit Ready SB-10 Files for Ontario: NECB 2020 Essentials Read More »

Engineer checking HVAC energy submeter

Facility Teams: Get Portfolio Manager Ready Energy Monitoring in 12 Months

Uncategorized / Admin

Practical, vendor agnostic plan for facility teams to build Portfolio Manager ready energy monitoring: inventory meters, collect 12 months of data, and…

Facility Teams: Get Portfolio Manager Ready Energy Monitoring in 12 Months Read More »

Standby generator in engineered service enclosure

60 Hour Cap and 5 Year Logs: Emergency Generator Rules for Ontario

Uncategorized / Admin

Ontario roadmap to CSA C282 compliance for emergency generators: transfer switch and grounding, 60 hour testing cap and five year test logs.

60 Hour Cap and 5 Year Logs: Emergency Generator Rules for Ontario Read More »

Electrician verifying commercial interior lighting

Five Moves for Alberta Builders to Avoid Permit Delays: NECB Lighting

Uncategorized / Admin

Permit-ready checklist for Alberta teams to meet NECB 2020 lighting rules. Five kickoff steps, control documentation, and AHJ submission tips.

Five Moves for Alberta Builders to Avoid Permit Delays: NECB Lighting Read More »

Commercial kitchen exhaust hood over cooking line

3 Code Mistakes That Kill Permits for Ontario Kitchen Ventilation

Uncategorized / Admin

MEP led, code focused steps to clear Ontario kitchen ventilation permits. NFPA 96 essentials, hood and make up air sizing, suppression, costs.

3 Code Mistakes That Kill Permits for Ontario Kitchen Ventilation Read More »

Exposed MEP services inside renovation wall

5 Renovation Triggers That Require MEP Plans and How to Hire in Canada

Uncategorized / Admin

Learn which renovations in Canada need engineer stamped MEP plans, how codes affect permits, and the hiring checklist homeowners should follow.

5 Renovation Triggers That Require MEP Plans and How to Hire in Canada Read More »

Engineer documenting exposed MEP work onsite

Get Faster Permits: OAA/PEO Templates for Ontario Field Review Reports

Uncategorized / Admin

Learn to use OAA and PEO templates to produce compliant, sequentially numbered field review reports in Ontario. Includes MEP checklists and FutureGen tips…

Get Faster Permits: OAA/PEO Templates for Ontario Field Review Reports Read More »

Engineer inspecting commercial fire alarm cabinet

Plan for $2,500–$25,000: Fire Alarm Upgrade Engineering Fees in Ontario

Uncategorized / Admin

Code driven budgeting for developers and contractors: understand P.Eng. stamped engineering fees for Ontario fire alarm upgrades, from $2,500 to $25,000+.

Plan for $2,500–$25,000: Fire Alarm Upgrade Engineering Fees in Ontario Read More »

Electrician inspecting switchgear panel

Electrical Maintenance Planning: A Standards-Aligned How-To

Uncategorized / Admin

Master electrical maintenance planning with a strategic approach. Learn how to create an effective plan that ensures safety and efficiency.

Electrical Maintenance Planning: A Standards-Aligned How-To Read More »

← Previous 1 … 6 7 8 … 15 Next →
FutureGen

FutureGen Consulting Inc. is a Canadian engineering consulting firm. We specialize in mechanical and electrical engineering design services in the residential and commercial industry.

Our Company

  • Who We Are
  • Services We Provide
  • What We Have Done
  • Contact Us

Our Services

  • Electrical Construction Cost Estimation
  • Fire Protection & Fire Alarm System Design Services
  • EV Charger Infrastructure Design
  • HVAC System Design Services
  • Construction Review
  • Emergency Power Desgin
  • Site Lighting Design Services
  • Solar Power Design
  • Plumbing Design
  • Fire and Life Safety Design
  • Power System Studies
  • Temporary Power Design
  • Power Distribution Services
  • Spinkler System Design

Contact Details

  • 6850 Millcreek Dr Unit 106, Mississauga, ON L5N 4J9
  • (905) 586-4114
  • info@futuregenconsulting.ca

Copyright © 2026 Futuregen

Powered by Futuregen